Sunday, October 16, 2011

You turn your back for just a few days...

And all of a sudden, there is a frame on the slab that is on your block of land!!!

It's been a hectic couple of weeks since we got back from holidays, and we've barely had time to stop to smell the roses, let alone watch the progress of our home.  Apart from a quick visit shortly after getting back, Sare and I have been busy with work, birthdays, and just catching up on everything that needs to be caught up on.

It was with huge anticipation that we visited our block this afternoon, and we were thrilled to see the progress.  Before going into detail on that, it's worth updating on the build administration going on while the real work happens in Cranbourne North.

We hadn't been in touch with Metricon since our return, thinking that we would leave it to them to get in touch if they wanted to issue the invoice for the slab.  Lo and behold, on Wednesday afternoon I had a phone call inquiring whether we'd received the invoice.  Bingo.  Since nothing had arrived in the mail, I requested that they forward it to me again so that I could pass it on to the bank.  Easy.  Upon passing it to the bank I was advised that they were still awaiting a copy of the building permit to proceed.  Not too difficult to arrange, but it would have been nice to have been asked for it, as we received it over a month ago.  With a bit of luck, everything should be sorted early this week.

The second phone call received from our builder this week was in relation to, wait for it, another one of their oversights.  This time they had forgotten to include in the contract the plumbing for our recycled water that is one of the estate covenants.  Quite how this had been missed not only by Metricon but also the developers when they gave their sign-off is quite beyond me.  Needless to say, the only way to deal with this was through a variation (number 9, and counting) and of course an extra cost to be added to the build.  My enquiry as to whether this should have been included in the fixed site costs was rebutted with a simple 'No'.  I guess that's not negotiable then!

The third and final call this week was from our site-supervisor.  He gave me a quick run down of the expected progress over the next few weeks and promised to call each week to update me.  It will be interesting to see if he follows through or not!

Anyway, on to the more exciting developments now.  The slab was finished on October 5 and looked absolutely huge when I went out and visited it.  Everyone has been telling me how the slab is supposed to look small compared to the finished house, so it may be that our home is going to even bigger than imagined!

 The slab, in all it's glory.  From the rear of the block, the bathroom plumbing centre left and wood for the frame at the far end.

Over the space of the last week and a half, the entire frame has been put up and the chippies were putting the finishing touches on the roof trusses.  With the guys still there doing their works, we decided not to venture on to the site to explore any further.  There will be plenty more opportunities in the weeks ahead.  The expected progress is that the fascia will be done on Monday and the roof shortly after that.  Then it will be on to the bricks, which we're both really looking forward to seeing the end result of our choice of colour!  The windows had all been delivered as well, so it won't be too long until the house is looking like a proper house, at least from the outside.  

 The view from the street
 Down the left side, with the windows in the foreground and the side al fresco jutting out

 The front entrance.  Garage on the left.

 The view from the rear of the block.

With this rate of progress, we may even be in by xmas.  Okay, that's way too optimistic, but at least it's full steam ahead at this point in time!!!

Tuesday, September 6, 2011

It's only the beginning

The beginning of the build that is!!!

The final building permit has been granted, so we're all set to get going now.  The only casualty as a result of the permit being issued was that we've been forced to reduce our al fresco area by 20cm on the west side of the house to bring it in to line with the council requirements, but at least this resulted in a nice credit in the variation.

Finance was approved, documents have been signed and returned and were today handed over to the settlements department.  Hopefully they don't have any issues with them, because I don't like the chances of them being amended before we head off on holiday!

We spent Sunday afternoon (following a lovely breakfast with the old man for father's day) on the lot clearing it of the debris that our neighbour's builders had kindly left for us.  Mowing the grass was a whole lot of fun too.  I did make a promise to Sare that it would be the first and last time I mowed the lawn there, so we're probably going to have to go shopping for either some fake grass or some concrete and green paint at some stage...

Today I spoke to Metricon and was advised that the site start would likely be sometime between September 12 and 14.  It will probably mean that by the time we get back we'll have a nice shiny new slab to look at, and potentially even the very early genesis of a frame.  Unless of course the weather degenerates over the next week in which case we'll come back to a patch of grass that will probably need to be mown again.

It's going to be fantastic to see our new home taking shape in the very near future!!

Wednesday, May 25, 2011

Show me(tricon) the money

With the block of land sourced and sorted, it was time to make a decision on what to build on our little patch of paradise. Looking through the estate covenants, it quickly became apparent that the developers weren't going to be too happy with my initial idea to pitch a tent and camp out. So, a proper building it was going to have to be.

Having looked through display homes of all varieties in suburbs such as Keysborough, Point Cook, Lyndbrook and Cranbourne North, we eventually settled on the design that first took our fancy.

The Hayman 29 by Metricon with the Classic facade was the final choice. It offered us four Bedrooms, two living areas, big kitchen, al fresco living, double garage and a whole host of other things we'd never have been able to get from the houses we were originally looking at. We're going to try and flip it so that the living area is north-facing on our block, but the below floorplan is essential what we'll get.

After plenty of consideration of what features we required and negotiating with the Metricon sales consultant, we placed our initial $1k deposit on the build on May 21. At this stage, we've gone with wooden floors, raised ceiling and door heights, colourbond roof, caesarstone benchtops, 900mm duel fuel cooker, and most importantly, soft close drawers and cupboards in the kitchen. There are going to be plenty more decisions to be made over the coming months, and we're looking forward to being able to designing our home to suit our requirements, rather than having to adjust our requirements to suit the house...

The Hayman 29 by Metricon with Classic Facade
The Hayman 29 Floorplan